Instalação U Track
Make the metal beads get stuck into the slot.

Faça as contas de metal ficar preso no slot.

Passo 1
Insert the slot with metal beads into the track.

Insira o slot na pista.

Passo 2
Install the track with the slot and metal beads onto the suspended ceiling.

Instale a pista no teto suspenso.

Passo 3
Instalação H Track
Fix metal bead curtains with connect buckles.

Corrigir metal talão cortinas com conectar fivelas.

Passo 1
Make the connect buckles with metal bead curtains hook to the curtain pulley.

Enganche as fivelas de conexão com cortinas metálicas à polia da cortina.

Passo 2
Install the curtain pulley with metal bead curtain onto the H track.

Fixe a trilha H no teto.

Passo 3
Tipos disponíveis